Land Plot Development Plan
- legal information
When reviewing the documents required to obtain a construction permit, you may wonder: What is a land plot development plan (GPZU)? This abbreviation refers to a document prepared in accordance with land-use regulations. A land plot development plan, or GPZU, forms part of the initial planning documentation attached to an application for permission to begin work on a plot. The plan is issued by the authorised local bodies at the request of the landowner.
Russian legislation has expanded the list of bodies that may prepare this document. Previously, a a land plot development plan was issued only by the Bureau of Technical Inventory; today it can be obtained from almost any accredited organisation. A GPZU is required when planning the construction of permanent structures: without it, a construction permit will not be issued. The plan is not mandatory for private house construction. Where to Obtain a GPZU, how long it remains valid and other questions are discussed in this article.
A GPZU contains the following information:
● maximum development parameters, including building height;
● setbacks from the plot boundaries;
● the layout of utility networks within the development area, if present;
● permitted uses of the land for which the proposed the issue of a land plot development plan;
● sanitary protection and other protected zones;
● applicable restrictions.
Validity Period of a Land Plot Development Plan
The document is generally valid for three years. Organisations undertaking construction or reconstruction should take this period into account. Owners of private property should also apply for a GPZU before a forthcoming sale or purchase of the plot.
Is There a Prescribed Document Format?
Order No. 741/pr of 2017, issued by Russia's Ministry of Construction, Housing and Utilities, approved the form and the procedure for completing the plan. Before obtaining a GPZU, you can review the form to avoid misunderstandings. In addition to information directly related to the proposed development, the document must state the actual site area, cadastral number and other particulars. Therefore, regardless of which body issues the land plot development plan, its format must comply with the applicable statutory requirements.
Where It Is Issued and How to Extend Its Validity
You can submit the documents for a land plot development plan to the district administration or a specialist organisation. Alternatively, an application can be submitted through the Gosuslugi public services portal or the nearest multifunctional service centre (MFC). Extending a land plot development plan follows the same procedure as its original issue. Once the validity period expires, a new application is submitted; no state fee is charged. Approval and issue take 30 days.
Once you understand what is meant by a land plot development plan and what it is used for, the next step is to decide how you intend to develop the plot. If you need the document urgently, you can contact our architectural bureau.
You may also be interested in
view all articles in Legal InformationWhat do you do?
We provide a full range of design services, from initial concepts to construction documentation for buildings and engineering systems, as well as architectural supervision during construction and more.
Why choose a bespoke design?
A bespoke design allows you to build the home you want, tailored to your requirements. It makes the most of your plot, its terrain and orientation, your preferred floor area and room layout, and many other considerations.
How long does it take?
Designing even a small house is a lengthy process, typically taking around six months. To save time, where appropriate we can develop the design in stages alongside construction.