Myza Pargolovo Community Space

Myza Pargolovo Community Space

117V Lomonosova Street, Saint Petersburg

  • Project team
    S. Shusterman, K. Shcherbina
  • Status
    in progress
  • Foundation
    cast-in-situ reinforced concrete
  • Walls
    brick
  • Roof
    pitched roof on timber beams
  • Finishes
    facing brick, timber, natural stone

The project comprises four buildings: three on one plot and a greenhouse on a separate cadastral plot.

We first reviewed the documentation for the plots, buildings and Shuvalovsky Park, including conservation obligations and cadastral and technical records. Although the buildings were not individually listed and were in poor condition, their location within a cultural heritage site imposed design restrictions. We also analysed the landscape and prepared a historical and cultural assessment of the area.

After reviewing the documents, we visited the site to photograph it, visually inspect the structures and foundations and take measurements for digital modelling. Three buildings were in poor condition, two were partly or completely ruined, and the house had burnt down approximately three years earlier.

The architects were asked to adapt the complex for public recreation, including a restaurant and kitchen, café, market, craft workshops and a house converted into guest accommodation. The concept uses natural materials — stone, timber and brick — with abundant planting, a winter garden and green courtyards containing medicinal plants and an outdoor stage.

After analysing the information, we began developing the three-dimensional concept in Revit.

Design progressed in stages. We first adapted the barns, adding a winter garden between them beneath a glass canopy contained within the existing foundations. The roof ridges were raised by 1.5 m while retaining distinctive architectural features. Work then focused on integrating extensions to the creative centre. The house remained single-storey and was divided into two apartments with a reception area. The greenhouse was also raised while retaining its roof form. All buildings were fitted to the terrain, and a masterplan established the site's functional zones.

2023–2025
design and construction dates
0.7 ha
project area